Design
Development
Monitor Design Schedule
Review the preparation
of bid documents and compare to schedules developed
during the conceptual design phase. Report on
progress and activities that are behind schedule.
Recommend corrective action as required.
Review Plans and Specifications
Review plans and
specifications as they are being developed. Check
construction feasibility and coordination of all
design disciplines. Advise on contract provisions
for controlling construction schedules. Advise on
special and general conditions.
Conduct Value Engineering Review
Conduct a
multi-disciplinary value engineering review to
evaluate alternatives for building systems that are
not within budget.
Report on Escalation Changes
Monitor the rate of inflation in the construction
industry and update cost projections accordingly.
Compare Design Development to Cost Models
As the design
progresses, compare trend estimates to cost models
and budgets by category.
Update Project Accounting Reports
Prepare current project accounting reports. Include
project cost summaries and detailed cost status
reports.
Identify Long-Lead Delivery Items
Identify material and
equipment which require long delivery times and are
critical to the progress of the work. Develop a
strategy for purchasing these items directly and
later assigning them to the appropriate contractor.
|
|